Versions / Builds Affected
LanGuard 2012 (20120717)Status
ResolvedProblem Summary
Languard 2012 incorrectly generates scheduled report times when using the 'Reoccur on the first of every 1 months'.TT / JIRAID
TT158How to Identify
When a scheduled report is configured using the 'Reoccur on the first of every 1 months' option, the 'Next Generation' value is created with a wrong date.
For instance:
1. Schedule set to occur first saturday of every month
- LanGuard schedules it to first run on 01.11.2012 (november 1st is a Thursday)
- Schedule should be 06.10.2012
2. Schedule set to occur first sunday of every month
- LanGuard schedules it to first run on 04.09.2012 (September 4th is a Tuesday)
- Schedule should be 07.10.2012
3. Schedule set to occur first monday of every month
- LanGuard schedules it to first run on 05.09.2012 (September 5th is a Wednesday)
- Schedule should be 01.10.2012Workaround / Fix Details
Apply the patch: http://ftp.gfisoftware.com/patches/LG11/20120717/LANGUARD11_PATCH_20120927_01.zip
Fixed in SR1.Required Actions
Apply the workaround or upgrade to LanGuard 2012 SR1.