Overview
When a scheduled report is configured using the 'Reoccur on the first <day> of every 1 months' option, the 'Next Generation' value is created with a wrong date.
Sample Use Cases
- The reports are scheduled to run every first Sunday of every month. The schedule of the first report should be on October 6 (first Sunday of October). LanGuard incorrectly schedules it to first run on September 3 (Tuesday).
- The reports are scheduled to run every first Monday of every month. The schedule of the first report should be on October 7 (first Monday of October). LanGuard incorrectly schedules it to first run on September 4 (Wednesday).
Environment
LanGuard 2012 (20120717)
Root Cause
This is a product defect which has been resolved in LanGuard 2012 SR1.
Resolution
Download and install the LanGuard 20120927_01 patch or upgrade to LanGuard 2012 SR1 to resolve this issue.
Priyanka Bhotika
Comments