Start a conversation

Incorrect Schedules Set When Using the 'Reoccur on the first <day> of every 1 months' Option

Overview

When a scheduled report is configured using the 'Reoccur on the first <day> of every 1 months' option, the 'Next Generation' value is created with a wrong date.

Sample Use Cases

  • The reports are scheduled to run every first Sunday of every month. The schedule of the first report should be on October 6 (first Sunday of October). LanGuard incorrectly schedules it to first run on September 3 (Tuesday).
  • The reports are scheduled to run every first Monday of every month. The schedule of the first report should be on October 7 (first Monday of October). LanGuard incorrectly schedules it to first run on September 4 (Wednesday).

 

Environment

LanGuard 2012 (20120717)

 

Root Cause

This is a product defect which has been resolved in LanGuard 2012 SR1.

 

Resolution

Download and install the LanGuard 20120927_01 patch or upgrade to LanGuard 2012 SR1 to resolve this issue.

Choose files or drag and drop files
Was this article helpful?
Yes
No
  1. Priyanka Bhotika

  2. Posted

Comments