Start a conversation

The Import Export Tool's 'Overall Progress' jumps to 100% and 'Finish' button is shown while still exporting

Versions / Builds Affected

20131111

Status

Resolved

Problem Summary

The Import Export Tool's 'Overall Progress' jumps to 100% and 'Finish' button is shown while still exporting

TT / JIRAID

1906

How to Identify

Processing (exporting) of the remaining mailboxes is still ongoing though. This is merely a UI issue and should not have a negative impact on the export process itself. The downside is that the administrator thinks that the export job finished already although it did not yet complete. Example flow: 1. There are 50 mailboxes in Exchange 2. You run the IET using the mode to export from "all mailboxes and folders" 3. You continue through the wizard and the export begins 4. At the point when the 1st mailbox is complete the "overall progress" bar jumps to 100% and the Cancel button changes to Finish 5. However, processing is still ongoing There are no debug log entries which help to identify that a customer is facing this issue.

Workaround / Fix Details

Fixed in MARC2014 build 20140616 ----- 20131111 http://ftp.gfisoftware.com/patches/MARC2013/20131111/MARC2013_R2_PATCH_20140306_1906.zip

Required Actions

Upgrade to MARC2014 build 20140616 or newer
Choose files or drag and drop files
Was this article helpful?
Yes
No
  1. Priyanka Bhotika

  2. Posted

Comments